Logo
The Web's #1 Resource For A Slow Carb Diet!

or Tax I.D. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website. The pedestal is monolithically poured with the foundation. Staten Island NY 10301 Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. Upon inspection, HIQA may issue any of the following: Corrective Action Requests (CARs)are issued to address conditions such as inadequate street restorations, missing or cracked street hardware or street cave-ins. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. CONTRACTORS SHALL NOTIFY IN WRITING BY LETTER POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ALL PROPERTY OWNERS ON THE AFFECTED STREET SEGMENT A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE. THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. NYCStreets system will automatically block an applicant from submission if insurance is not current. Applicants may provide complete copies of insurance policies instead of certificates of insurance. Street excavators, including utility companies and developers, can access New York City Department of Transportation (NYC DOT) data and attend NYC DOT coordination meetings to facilitate effective communication regarding planned street work. 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. MAINTAIN 5 FEET FOR PEDS ON SIDEWALKS 15 FEET OR MORE IN WIDTH. A temporary sidewalk closure while a sidewalk repair is underway. ON STIP WAGE02), WORK NORTHBOUND 7AM-4PM M-F AND 9AM-6PM SAT/SUN. IN AREAS WHERE A FENCE/BARRICADE USAGE IS PERMITTED THE FENCE/BARRICADE CANNOT OBSTRUCT, RESTRICT OR COMPROMISE THE SIGHT LINES OF PERDESTRIAN/VEHICULAR INTERFACE. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015). An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. NYC Parks & Recreation NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. USE OF METERED, AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED.td>. MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. Permittees can use these maps to make informed decisions while planning new projects. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. Each canopy maintenance permit expires one year after the date of issuance, unless revoked sooner by NYC DOT. Click here for a list of current construction embargoes. DOT uses higher wattages on wide or commercial corridors and lower wattages on narrow or residential streets. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. These holds can only be released by OCMC executive staff. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Customer Service: (718) 286-0600, Staten Island WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. **DOT's lighting division generally classifies cross streets as local roadways*DOT's lighting division generally classifies avenues and boulevards as collector roadways. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. MAINTAIN 1 - 11 FOOT LANE ON ONE-WAY STREETS AND TWO 11 FOOT LANES ON TWO-WAY STREETS. NYCStreets system will automatically block an applicant from submission if insurance is not current. NYC DOT Standard Highway Specifications, May 16, 2022 NYC DOT Standard Details of Construction, June 6, 2022 Sewer and Water Main NYC DEP Standard Sewer and Water Main Specifications, August 8, 2022 NYC DEP Specifications for Trunk Main Work, July 2014 NYC DEP Water Main Standard Drawings, December 2020 NYC DEP Sewer Design Standards, August 2018 Tel: (718) 298-7300 (212) 748-6670 WORK IN ACCORDANCE WITH OCMC STIP SHEET AND ALL VALID AMENDMENTS, AND LOCATION SHEET WHICH MUST BE ATTACHED TO THIS PERMIT AND ON SITE. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). OR PUBLIC PARK WRITTEN APPROVAL FROM CITY OF NEW YORK PARKS AND RECREATION IS REQUIRED. After obtaining HIQA's authorization, the applicant will be referred to the Permit Office in the borough in which the canopy will be located. (212) 839-9561/9566 These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. In some cases, applications and supporting documentation must be submitted in person. Third, following installation of the canopy, a final inspection by HIQA is required to confirm compliance with the applicant's submitted plans. Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. (718) 391-1008 MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. THIS STIP IS USED FOR WORK IN AN INTERSECTION. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. Capital Project by Other Agency (CPO) hold A CPO hold is automatically placed if the proposed permit location involves a current capital street reconstruction project or one that is being planned. BQE Central Workshops. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". POSITIONING OF TRAFFIC SIGNS (TOTAL OF . DURING CLOSURE SCA MUST SUPERVISE FLAGERS AT EACH INTERSECTION APPROCHING THE WALKWAY CLOSURE DIRECTING PEDESTRIAN TO OPPOSITE SIDEWALK VIA CROSSWALK. MAINTAIN 5 FOOT PED. Bronx, NY 10461 PROJECT COORDINATED THROUGH PLANNING & SUSTAINABILITY FOR PILOT PROGRAM. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) Kew Gardens, NY 11424 Tel: (718) 482-4825. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. Fax: (212) 361-1900, Queens During the processing of the permit, if there is a hold, the applicant is notified of the type of hold and the steps the applicant must take to release the hold. In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. If no changes are required, the permit will be released. BACKFILL/COMPACT IN 12 INCH LIFTS. Certification by the manufacturer that the covering is flameproof. A 4' X 4' FIXED ORANGE CONSTRUCTION SIGN WITH 5" BLACK LETTERING MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE AT A LOCATION ENTERING THE STREET TO BE CLOSED. OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. PARKING OF NON-COMMERCIAL VEHICLES ON THE STREET (ROADWAY AND SIDEWALK) WITHIN WORK ZONES IS PROHIBITED. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. PERMITTEE MUST NOTIFY NYPD/TRAFFIC MANAGEMENT CENTER 48 HOURS PRIOR TO CHANGING ANY SIGNS/MARKINGS. WORK 9 PM TO 6 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH TO TRAFFIC WHEN SITE IS UNATTENDED. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. CNRRES-RESTORE AS PER SKETCH #6 OF DOT'S PROTECTED STREET RESTORAITON REQ'MENTS. Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. Queens.Forestry@parks.nyc.gov Permit applications near bridges are subject to approval by the Division of Bridges. Fax: (718) 858-0069, Manhattan New York, NY 10007 A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. SPECIFICATION. 1400 Williamsbridge Road, 1st floor Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. A CRIA statement is required if the closure is expected to last for more than 180 consecutive calendar days, as set forth inSection 2-16 of the Highway Rules. Regular Input and Attendance of Decision Makers at Coordination 10 Richmond Terrace, Room 427 Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. 47-40 21st Street - 7th Floor NO WORK IS TO BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. 30-30 Thomson Avenue, 4th Floor The notice provisions specified in Section 2-02(g) of the Highway Rules are the minimum required for street operations. DESIGNATED AS A FULL DEPTH CONCRETE ROADWAY THAT MUST BE RESTORED IN KIND AS PER DOT STANDARD SPECIFICATION #1042A&B. number as provided by the Internal Revenue Service (IRS). 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. (212) 839-8980 Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. At that point, OCMC executive staff will determine if additional permit stipulations are required. Deleted or Superseded Standard Sheet documents are accessible through the links in the second table below. MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. Where applicable, an applicant must submit an original Permit Bond to the Permit Office at the time of permit issuance to cover all costs and expenses that may be incurred by the city as a result of the activity for which the permit is issued or for the purpose of otherwise safeguarding the interests of the city. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. For failure to comply with the terms or conditions of such permit, the Highway Rules or other applicable law in carrying out the activity for which the permit was issued; Whenever there has been any false statement or any misrepresentation as to a material fact in the application or accompanying papers upon which the issuance of the permit was based; or. THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. Office hours: Applications accepted, only from 8:30 AM to 12:30 PM; FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. For questions, Monday to Friday from 8:30 AM until 5:00 PM. 42 Broadway OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The second permit for canopy maintenance is automatically placed on a. Procedures to follow in the event of an emergency or the need to apply for a permit during an embargo period are explained in Section 3.6 Emergency Work and Special Circumstances later in the chapter. Bronx, NY 10457 Tel: 718-286-3170 PERMITTEE/SPONSORING AGENCY REQUIRED TO POST ADVISORY SIGNS ON THE SEGMENT AFFECTED MIN 48-HRS PRIOR TO CHANGING EXISTING SIGNS. A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. New York, NY 10007-1216 WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. NO WORK EXCEPT FOR EMERGENCY WORK MAY OCCUR. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. The streets themselves also serve as public spaces, fostering social, economic and recreational activities. 16 Court Street, 7th Fl. Call before you dig. The Third Edition of the Street Design Manual renews the Manuals status as a living document and reinforces its role as a critical resource for those working on projects in New York Citys public right-of-way. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. Manhattan / Central Permit Office To request release of a COB hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. SECTION 5: DESIGNATED REPRESENTATIVE(S) TO ACCEPT SERVICE OF SUMMONS AT THE APPLICANT'S BUSINESS OFFICE: Enter the names of at least two people who are authorized to accept summonses for his/her corporation and who are located at his/her business address. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure.

Topanga Land Tv Show Premiere, Florida Man December 27, 2005, Articles N

nyc dot traffic standard drawings